Fabric strategy
The RIBA Passivhaus Overlay, published by the RIBA in 2022, states in relation to the Fabric Strategy This comprises form factor, glazing and shading and structural engineering strategies, and thermal performance requirements, as well as the Airtightness and Thermal Integrity Strategy, thermal bridge assessments and the Construction Programme. With a focus upon construction technology and buildability, develop an integrated approach which supports the airtightness strategy, thermal integrity strategy and thermal bridging mitigation strategy. Well implemented strategies avoid complexity, simplify construction, and reduce costs, avoid risks and the shorten the Construction Programme. To support this process, review plans, cross sections, longitudinal sections etc. and identify all junctions and interfaces. Consider how the building’s form and complexity impact upon the construction sequence and may compromise the airtightness testing regime, the standard of airtightness, the thermal integrity, and the extent of thermal bridging. At each stage and before work starts on site, to help ensure the right materials, plant and operatives are deployed in the right place at the right time, pay attention to the properties, characteristics and suitability of materials, products, components, and sub-assemblies, including their tolerances, impact upon interfaces, their fabrication and manufacturing techniques, their logistics (including the lifting, handling, transport and delivery methodology) and assembly. If possible, also seek to eliminate scaffolding and wet or hot works. Where appropriate, and liaising with the Passivhaus Designer/Consultant, agree which thermal bridges require calculation.”
[edit] Related articles on Designing Buildings
Featured articles and news
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.